Strong site supervision is the difference between a project that lands on programme and one that quietly loses two months and a chunk of margin. Here is the standard Glossy applies on every build.
Every Glossy site opens with a written site-establishment checklist: hoarding, welfare, first-aid, fire points, NCA signage, all-risks insurance certificates, and a daily site diary opened before the first block is laid.
The resident engineer or clerk of works then runs a daily walk-around against the approved drawings and specifications. Any deviation is photographed, logged, and issued as a non-conformance report the same day — never at week-end when memory has faded.
Concrete pours, structural steel connections, and waterproofing details are held points: no work proceeds without a signed inspection by the consulting engineer. This single discipline eliminates the vast majority of latent defects that come back to bite two years after handover.
- Open every site with a documented establishment checklist
- Log deviations the same day, not at week-end
- Enforce held points for concrete, steel, and waterproofing